Completed Mandeville family bathroom with double vanity, bathtub, tiled floor and built-in shelving

Case Study · Mandeville, Louisiana

Family-Friendly Hall Bathroom Renovation in Mandeville, LA

For a family with three young children, the goal was clear: create a bathroom with a bathtub, eliminate direct access from outside, improve water-temperature control, and add much-needed storage. The result is a more practical space designed around everyday family life.

4 WeeksTimeline
$30K–$40KInvestment
MandevilleLocation

Planning a bathroom that works better for your household? Explore our bathroom remodeling services in Mandeville for more information about our process and other completed projects.

The Homeowners’ Goal

A Bathroom Designed Around Three Young Children

The existing hall bathroom had a single vanity, limited storage, and a door leading directly outside. The homeowners wanted a different setup: a bathtub for their three young children and a bathroom that could no longer be entered directly from outdoors.

The renovation also created an opportunity to improve the bathing controls and make better use of the room’s storage space. The priorities were family safety, day-to-day function, and a clean, updated finish.

Before & After

From an Outdated Layout to a Family Bathroom

Before renovation: Mandeville hall bathroom with single wood vanity, older tile flooring and exterior door
BEFORE: The existing layout had a single vanity, older finishes, and direct access to the backyard.
After renovation: Mandeville hall bathroom with double-sink vanity, bathtub, tiled shower wall and built-in storage
AFTER: A bathtub, double-sink vanity, tiled surfaces, recessed shower niches, and shelves beside the tub.

The Construction

What Happened Behind the Walls

A finished bathroom doesn’t show the work needed to change a layout. These progress photographs document exposed framing and the plumbing and electrical work during the renovation.

Bathroom renovation in progress showing exposed wall framing and removed finishes
Existing finishes removed and framing exposed as the layout was changed.
Exposed framing and plumbing near the former exterior door during Mandeville bathroom renovation
Framing and plumbing work in the area near the former exterior access.
Bathroom wall open to show plumbing supply lines, drains and electrical wiring during remodeling
Supply lines, drain piping, and electrical wiring visible before the walls were closed.

The Finished Renovation

Built for the Way This Family Lives

01 · A Bathtub for the Children

The new bathing area includes a bathtub with a tiled surround and recessed niches for bath products.

02 · Improved Temperature Control

A Delta thermostatic shower control was selected with the children’s safety in mind, helping regulate shower water temperature. Adult supervision and proper temperature settings remain important.

03 · No Direct Exterior Bathroom Access

The renovation removed the bathroom’s direct outside access, addressing an important concern for the homeowners.

04 · Storage Where It Was Needed

Open built-in shelves alongside the bathtub added useful storage that the old bathroom lacked.

05 · Updated Everyday Finishes

The completed space features a double-sink vanity, tiled floor, updated lighting, and a brighter, more coordinated look.

Project Snapshot

Four Weeks. A Bathroom That Works Better.

This Mandeville hall bathroom renovation took approximately four weeks, with a project investment in the $30,000–$40,000 range.

This is the investment range for this specific completed project, not a fixed price for all bathrooms. Costs vary with layout changes, materials, fixtures, and the work required behind the walls. See our bathroom renovation services for more information.

Ready for a Renovation?
We’re Ready to Help!

Whether your bathroom needs a better layout, more storage, or a complete renovation, we’d be glad to talk through the possibilities.

Schedule a Consultation

Call 985-869-5828 · Total Construction & Renovation LLC